Main.10-06-2013General History

Hide minor edits - Show changes to markup

October 06, 2013, at 05:12 PM by adric - i will clean up and clarify this more in the future.
Changed lines 45-120 from:

Notes:

to:

Notes:

Meeting started at 4:55 Walter, bandit, Ray, Alfred, john, morgai, alfred, adric, and greg, shere, juli and 5 others here

Jt and

 morgain  5min of fame, they are planning an arcade mame build. 

Ground rules were read

tour scheduled for the end,

Greg talked about Quarintine ABQ, and the timetable, we will be handing out fliers at the exit,

Indigogo campaign, we are at $1774, with 16 days to go, also going to keep asking people to keep donating,

Walter wants to make sure there is a pipeline for communicating with our new landlord (greg, walter and charel)

Fire Marshall walk through on the 4th, Fire inspector did not see issues with, we will still need to do our own next month.

We would like to do something nice for caroline (old landlady)

Talked a little bit of the floorplan/spacecadets work.

New bylaws will be finalized soon, board will get relected shortly after.

  • there will be a split between the ops and the business parts of the space,
  • there will be managers and board.

Moving Plan!

  • inventory taskforce is proposed, Adric will head this up.
    • proposing to clear our own personal crap,

Moving in planning

  • packing
  • building new
  • moving
    • goal of november 24th being our first hacknight.

Grand opening ideas!

  • food food trucks,
  • booze
  • Blackout theater
  • ABQ aerialists
    • bouncy castle?
    • ball room
  • popup makerfaire(micro makerfaire)
  • Aaron brings up make it more of a party.
  • Start up mid afternoon, evolves into a evening party.
  • Collaborative art project (Jezera, aflfreds brothers area,(sp?) willing to head this up).

Treasurer report,

  • First Quarintine deposit was done,
    • we are ok for a bit, but will need more members and more workshops Start thinking up subjects.

3dprintibng club, some progress on the filiment extruder, but nothing yet extruded. 2nd printer is still in the works after the move.

  • printer did take a fieldtrip. to tedx, and to santafe STEM event.

Ignite, we made about $320 to teach kids to solder, we are in conversation with a teacher now.

Tedex, went well, lots of interest in quelab and 3d printing.

Coworking crawl, Albuquerque TechFiesta Crawl,

John, wants to know what we can scavange

October 06, 2013, at 02:15 PM by adric -
Added lines 32-35:
  • Plans for setting up new space
    • How to inventory and mark quelab tools/equipment/art
    • How to deal with donations/personal loaned things/art
    • How to deal with abandoned stuff(policy)
October 06, 2013, at 12:09 PM by 174.56.56.21 -
Changed line 15 from:
to:
October 06, 2013, at 08:40 AM by 97.123.31.171 -
Changed lines 30-33 from:
  • Future Strategic Planning Session
    • How to inventory and mark quelab tools/equipment/art
    • How to deal with donations/personal loaned things/art
    • How to deal with abandoned stuff
to:
  • Moving plans (early November)
October 04, 2013, at 12:26 PM by 216.184.2.22 -
Added lines 31-33:
  • How to inventory and mark quelab tools/equipment/art
  • How to deal with donations/personal loaned things/art
  • How to deal with abandoned stuff
October 01, 2013, at 11:39 AM by JT - fixing typo
Changed lines 4-5 from:

I'm *very* happy to report that this month's general meeting will actually be held in the NEW Quelab (version 2.0) North Campus location. Please NOTE that the first project in this new location is already in works, so we will have to work around their set up. Check out QuarentineABQ for more information.

to:

I'm *very* happy to report that this month's general meeting will actually be held in the NEW Quelab (version 2.0) North Campus location. Please NOTE that the first project in this new location is already in works, so we will have to work around their set up. Check out QuarantineABQ for more information.

Changed line 26 from:
  • Blackout Theater Production: QuarentineABQ
to:
  • Blackout Theater Production: QuarantineABQ
September 24, 2013, at 11:19 PM by 97.123.31.171 -
Added line 6:

Not only will we finally get to meet in our new space, we will also get a sneak peak at the very first project in it. The set up will be complete and Blackout Theater will be in the final stages of rehearsal. They are requesting that we be courteous of their production and stay out of the way that evening.

September 24, 2013, at 10:41 PM by 97.123.31.171 -
Changed line 4 from:

I'm very happy to report that this month's general meeting will be held in the NEW Quelab (version 2.0) North Campus location. Please NOTE that the first project in this new location is already in works, so we will have to work around their set up. Check out QuarentineABQ for more information.

to:

I'm *very* happy to report that this month's general meeting will actually be held in the NEW Quelab (version 2.0) North Campus location. Please NOTE that the first project in this new location is already in works, so we will have to work around their set up. Check out QuarentineABQ for more information.

September 24, 2013, at 10:41 PM by 97.123.31.171 -
Changed lines 4-5 from:

I'm very happy to report that this month's general meeting will be held in the NEW Quelab (version 2.0) North Campus location. Please NOTE that the first project in this new location is already in works, so we will have to work around their set up. Check out QuarentineABQ for more information.
\\

to:

I'm very happy to report that this month's general meeting will be held in the NEW Quelab (version 2.0) North Campus location. Please NOTE that the first project in this new location is already in works, so we will have to work around their set up. Check out QuarentineABQ for more information.

Changed line 7 from:

\\

to:
September 24, 2013, at 10:40 PM by 97.123.31.171 -
Changed line 6 from:

to:

September 24, 2013, at 10:40 PM by 97.123.31.171 -
Changed line 6 from:

to:

September 24, 2013, at 10:40 PM by 97.123.31.171 -
Added line 7:

\\

September 24, 2013, at 10:39 PM by 97.123.31.171 -
Added line 6:

September 24, 2013, at 10:38 PM by 97.123.31.171 -
Changed line 4 from:

I'm very happy to report that this month's general meeting will be held in the NEW Quelab (version 2.0) North Campus location. Please NOTE that the first project in this new location is already in works, so we will have to work around their set up.\\

to:

I'm very happy to report that this month's general meeting will be held in the NEW Quelab (version 2.0) North Campus location. Please NOTE that the first project in this new location is already in works, so we will have to work around their set up. Check out QuarentineABQ for more information.\\

Changed line 6 from:

Location: Quelab "North Campus" 680 Haines Ave NW\\

to:

Location: Quelab "North Campus" 680 Haines Ave NW.

September 24, 2013, at 10:35 PM by 97.123.31.171 -
Deleted line 3:

\\

September 24, 2013, at 10:28 PM by 97.123.31.171 -
Changed line 5 from:

I'm very happy to report that this month's general meeting will be held in the NEW Quelab (version 2.0) North Campus location. Please NOTE that the first project in this new location is already in works, so we will have to work around their set up.\\

to:

I'm very happy to report that this month's general meeting will be held in the NEW Quelab (version 2.0) North Campus location. Please NOTE that the first project in this new location is already in works, so we will have to work around their set up.\\

September 24, 2013, at 10:28 PM by 97.123.31.171 -
Changed line 5 from:

NOTE: All general business meetings are open to Quelab members and members of the public. Attendance is encouraged! Please bring a potluck item to share.\\

to:

I'm very happy to report that this month's general meeting will be held in the NEW Quelab (version 2.0) North Campus location. Please NOTE that the first project in this new location is already in works, so we will have to work around their set up.\\

September 24, 2013, at 10:17 PM by 97.123.31.171 -
Changed line 8 from:

\\

to:

Link to map\\

September 24, 2013, at 10:07 PM by 97.123.31.171 -
Changed line 7 from:

Location Quelab "North Campus" 680 Haines Ave NW\\

to:

Location: Quelab "North Campus" 680 Haines Ave NW\\

September 24, 2013, at 10:07 PM by 97.123.31.171 -
Changed line 7 from:

Location Quelab "North Campus" 680 Haines Ave NW

to:

Location Quelab "North Campus" 680 Haines Ave NW\\

September 24, 2013, at 10:07 PM by 97.123.31.171 -
Added line 7:

Location Quelab "North Campus" 680 Haines Ave NW

September 24, 2013, at 10:04 PM by 97.123.31.171 -
Changed line 22 from:
  • Blackout Theater
to:
  • Blackout Theater Production: QuarentineABQ
September 24, 2013, at 10:03 PM by 97.123.31.171 -
Changed line 21 from:
  • New Location!! Tour
to:
  • Quelab North Campus!! Tour
Changed lines 30-33 from:
to:
  • 3-D printing club
  • IgniteNM
  • TEDxABQ
  • Coworking crawl
September 24, 2013, at 09:59 PM by 97.123.31.171 -
Changed line 15 from:

2. Ground Rules\\

to:

2. Ground Rules

Changed line 20 from:

3. Old Business\\

to:

3. Old Business

September 24, 2013, at 09:58 PM by 97.123.31.171 -
Added line 24:
  • Bylaws update
Changed line 27 from:
to:
  • Grand opening ideas
September 24, 2013, at 09:53 PM by 97.123.31.171 -
Changed line 27 from:

5. Reports (5 minutes max)

to:

5. Reports (5 minutes each, max)

September 24, 2013, at 09:51 PM by 97.123.31.171 -
Added lines 30-31:
September 24, 2013, at 09:50 PM by 97.123.31.171 -
Deleted line 14:
Changed lines 16-19 from:
to:
  • We're all on the same team.
  • Take care of yourself.
  • When in doubt, ask.
  • If there's a question about process, i'll decide.
Changed lines 21-23 from:
to:
  • New Location!! Tour
  • Blackout Theater
  • Indiegogo fundraiser
Added line 25:
  • Future Strategic Planning Session
Changed line 31 from:

Notes:

to:

Notes:

September 24, 2013, at 09:39 PM by 97.123.31.171 -
Added lines 1-26:

append '&action=print' for a printable version of any wiki page!

October General Business Meeting Agenda:


NOTE: All general business meetings are open to Quelab members and members of the public. Attendance is encouraged! Please bring a potluck item to share.

Date: 06 October 2013

Time:

  • 4:30 pm Volunteer Appreciation Pot Luck Social
  • 4:55 pm 5 min of fame (Name - if known)
  • 5:00 pm General Business Meeting:

1. Agenda Review
* 2. Ground Rules
* 3. Old Business
* 4. New Business (18 minutes max)

5. Reports (5 minutes max)

  • Treasurer's report

Notes: